Skip to content
Klamath Tribal Water Quality Consortium
Annual State of the Basin
Dam Removal
Tribal Water Quality Plans
TMDL
Other Regulatory Processes
Links to Useful Websites
Documents
Characterization of Organic Matter Fate and Transport in the Klamath River below Link Dam to Assess Treatment/Reduction Potential. Prepared for U.S. Bureau of Reclamation Klamath Area Office by Watercourse Engineering, Inc., Davis, CA. 167 p.
Posted by
in
Download
Filename:
DEAS_Keno-Wetlands-Project-Report-9-30-06a.pdf
Categories:
Water Quality Reports and Memos
Author:
Deas, M. L. and J. Vaughn
←
Klamath River Modeling Project. Project #96-HP-01. Assessment of alternatives for flow and water quality control in the Klamath River below Iron Gate Dam. University of California Davis Center for Environmental and Water Resources Engineering. Report No. 99-04. 379 pp. [3.6 Mb] At KRIS Web site.
Aquatic Vegetation in Selected Sites of the Lost River, OR and CA. Prepared for Tetra Tech Inc. by MaxDepth Aquatics. Max Depth Aquatics, Bend, OR. 18 pp.
→
More posts
Another test post.
April 17, 2026
Test post 1
February 8, 2026
Hello world!
December 9, 2025