Skip to content
Klamath Tribal Water Quality Consortium
Annual State of the Basin
Dam Removal
Tribal Water Quality Plans
TMDL
Other Regulatory Processes
Links to Useful Websites
Documents
Memo on Scott River TMDL Implementation. From QVIR Environmental Director Crystal Bowman to Catherine Kuhlman, NCRWQCB Executive Director of May 13, 2009. Quartz Valley Indian Reservation, Ft. Jones, CA. 3 p. Photos (Appendix A) .
Posted by
in
Download
Filename:
Scott-TMDL-Progress-Comments_QVIR_05.13.09.pdf
Categories:
Comment Letters / Agency Reports and Notices / EIRs
Author:
Quartz Valley Indian Community
←
Comments on Draft Scott River Basin Agricultural Coho Salmon Incidental Take Permit. Submitted to CDFG, Region 1 by QVIR. ITP filed with CDFG. 29 p.
Comments on Public Review Draft, Staff Report for the Klamath River Total Maximum Daily Loads (TMDLs) and Action Plan Addressing Temperature, Dissolved Oxygen, Nutrient and Microcystin Impairments in California, the Proposed Site Specific Dissolved Oxygen Objectives for the Klamath River and California, and the Klamath River and Lost River Implementation Plans. Submitted by Crystal Bowman. QVIR, Ft. Jones, CA. 20 p. ( Appendix A: Higgins comments Re: Fruit Growers Supply (FGS) Habitat Conservation Plan (HCP) and Draft Environmental Impact Report.) ( Appendix B: Comments on State Water Resources Control Board Resolution 2009-0064 Regarding U.S. Forest Service Management Oversight.)
→
More posts
Another test post.
April 17, 2026
Test post 1
February 8, 2026
Hello world!
December 9, 2025